ASSESSMENT OF SERVICE QUALITY AND EFFICIENCY OF BUS RAPID TRANSIT SYSTEM
Syeda Azka Fatima 1, Khadija Imtiaz 1.
1Lahore College for Women University
* Correspondence: Syeda Azka Fatima, azka88fatema@gmail.com
Citation | Fatima.S.A, Imtiaz.K“Assessment of Service Quality And Efficiency of Bus Rapid
Transit System”. International Journal of Innovations in Science & Technology, Vol 02 Issue
04: pp 125-136, 2020.
Received |Oct 11, 2020; Revised | Nov 10, 2020; Accepted | Nov 12, 2020; Published |
Nov 13, 2020.
Abstract
Transportation is an indistinguishable component of any society. Provision of luxury
transportation at favorable rates to general public is the need of the day for societal comfort.
Research has been done to assess the service and efficiency level of(Bus Rapid Transit)BRT
system by evaluating initial parameters including passenger’s attitudes towards quality, safety,
security, and service provided by Metro bus Lahore as well as identifying problems
encountered by passengers. In Pakistan, local transportation play significant role for
travelers to commute whereas the vast transportation system of Lahore and construction of
Metro Bus Transit System with consideration to balance demands of traffic has provided
safer, economical and secure public transport system to the people. This research has been
carried out from Shahdara to Gujjumata. The questionnaire-based survey was conducted.
which was comprised of questions according to problems, needs of passengers and
indicators which were set to identify the service quality of Metro Bus. It is revealed from
analysis that majority of people are satisfied from service quality, punctuality, accessibility
and efficiency provided by BRT system. It is also observed that this service is user-friendly
for physically impaired persons. Dissatisfaction level was also observed on low seating
capacity in buses, security, safety of users on board. This research suggests concerned
authority to improve, enhance current passenger services and provide better services so that
current users can enjoy services and attract new passengers to use Metro bus as well as
imply international best practices in Pakistan urban transport.
Keywords: Bus Rapid Transit (BRT), Passenger satisfaction, Metro Bus,
INTRODUCTION
Transportation is important part of any society. Buses, LRT (Light Rail Transit),
BRT (Metro Buses), wagon, mini-vans, auto-rickshaws and taxis are the types of urban
transport. Public transport is to satisfy the passengers, by providing the high-quality services
[1]. The passenger’s perception is an important measure in evaluating the level of the quality
of bus service [2]. Both the developed and developing countries, have faced many problems
in urban transportation such as poor quality infrastructures, mismatch between demand and
supply, crowd of passengers and congestion on roads that lead to increase travel time due to
improper segregation of bus lanes [3]. Urbanization and increased number of vehicles are
responsible for environmental degradation [4]. Burning of fuels by vehicles add a
considerable amount of CO2 in the atmosphere which is ozone precursor. The main sources
of Ozone precursors are petrol pumps, industries, residual smoke from factories, automobile
emissions, water desalination plants and gas-based power stations [5]. Public transport is an
alternative source for reduction of environmental pollution. To overcome such problems,
BRT bus service was introduced which is a city-based, high speed transport travel
framework in which buses travel on dedicated routes [6][7]. BRT is now a
days broadly executed in both the developed and developing world [8]. Deng and Nelson
(2012) [9] found that 75.4% people were diverted from previous bus system to BRT [9][10].
Nugroho et al. ( 2010) [11] studied almost 14% private car users altered their
transportation mode to BRT within four months in the city. Echeverry et al.(2004)][12]
studied the travel time for users of the city reduced by 32%. Gutierrez (2010)[13] mentioned
that BRT showed better performance, user satisfaction, travel time, reliability and
improved urban environment than the previous bus system [14,15, 16, 17].
The aim of this study was to assess the current public bus services in the city and to
suggest a sustainable and suitable rural-urban bus system. This study includes identification
of research problem, research questions formulation, formulation of research objectives,
reviewing the literature of developed countries, and to suggest measures for improvement in
current metro system in local context. A questionnaire was designed by considering the
research questions and objectives which helped in data collection and in analysis of collected
data.
The main objective of this research was to review the literature regarding quality of
BRT (Metro bus), its efficiency and passenger’s satisfaction level in international and national
context. Other objectives include the establishment of the performance indicators,
assessment of the service quality and efficiency of BRT (Metro Bus) using that criteria. To
improve quality of bus service conclusions and recommendations are drawn upon analysis.
Material and Methods
Metrobus is operating in various cities of Pakistan but here we are specifically
concerned with metro bus working in Lahore Punjab, Pakistan which is one of the biggest
rapid bus (transit services). Lahore Metrobus service is coordinated with Lahore Transport
Company's (LTC) local bus service to function as an urban transport system, which provide
transit benefits across Lahore with association to neighboring suburban communities. Till
May 01, 2017 the system had transported 210 million passengers supported by 64 buses.
Metro bus infrastructure was developed in Lahore covering a distance of 27 km on
Ferozepur Road corridor comprising of 27 stations with an average distance of 1.04 km
from station to station. The terminal stations are Shahdara, in the North west side and
Gajjumata, in the South-East side of Lahore. Metro bus stations are showing in Figure 1.
Figure 1. Route map of metro bus stations.
Seating capacity of buses utilized in BRT Lahore is 160 which create a normal
directional capacity of 3906 travelers per hour. Normal everyday ridership of
Metro transport Lahore is nearly 125,000. Working hours of metro bus service are 16, from
6am to 10pm. Peak hours starts from 7am to 10am and from 4pm to 8pm. The frequency of
Metro bus Lahore is 20 buses per hour in off-peak hours and 27 buses per hour
in peak hours. In off-peak hours, the time headway is 3 minutes. From terminal to terminal
the maximum time required is 63 minutes which is achieved mostly but sometimes, when
peaking takes place at stations, dwell time is increased.
Material:
Primary data was comprised of questionnaires designed to achieve the real-time
information about the passengers’ perceptions. In this research, secondary data sources were
Government or Metro bus offices, books, magazines and daily papers,
reports arranged by researchers, open records and measurements.
Thus, a total of 125000 daily ridership came into calculations when sample size was
known. The sample size is determined from the Solvin sample size formula (1960) [18]:
n = N/1 + Ne2
The calculated sample size was 2400, the sample was determined through random
sampling from different stops. The collected data was further processed by the chi-square
test, t-test, and regression analysis on SPSS to draw the best results. After applying these
analyses, the best method was a correlation to support the defined variables.
Table 1: Evaluation criteria of performance indicators
A closer cross examination reveals that passengers were divided in different
satisfaction levels towards the bus service-quality. These divisions were used to examine the
level of disagreements and agreements in term of their perceptions. The satisfaction levels
were categories as 0% 20% 40% 60% and dissatisfied levels as 47% 36% 17%.
Table 2 Summary of Public response to various quality attribute
Discussion
In Pakistan, Metro bus was the first bus rapid transit project and the aim to
implement this project was to provide high efficiency and better service quality through fast,
reliable and comfortable BRT system that fulfills the demand of passengers for achieving
high satisfaction level. By evaluating service quality, attributes such as station services, bus
comfort, bus condition, facilities inside buses are ensured which reveals that Metro Bus is
solving many problems in term of mass transportation e.g., reduced travel time, easy
accessible to long distance users and the cost-efficient as compared to other public transport.
Analysis on service quality and efficiency of Metro bus service were drawn on the basis of
passenger’s perception. The result regarding the performance of headway shows that mostly
passengers are satisfied from the punctuality and accessibility of buses.
As per analysis, predominant satisfaction level was observed on efficiency of Metro
bus service like the guidance availability (maps, timetable, information on delays, etc.),
provision of ramps/ escalators for disabled persons, availability of enough space at bus level
boarding, enough leg space in buses, space for wheelchair inside bus, widened door for
wheelchair and carrying items. Bus conditions like ventilation, comfortability of seats and cleanliness were also observed satisfied by users. Analysis show that most of users show dissatisfaction level on sitting area at Metro stations because of inadequacy of benches, in adequate seating capacity in buses, security, safety of users on board and in adequate seating capacity for elderly people inside buses. Majority of the users showed ordinary behavior on regular monitoring and maintenance of Metro bus services as BRT system of Lahore is confronting numerous maintenance issues with respect to BRT hallway, lifts, washrooms, water coolers and sewerage framework. Escalators were observed collapsed due to maintenance work. We assessed the quality of the service, efficiency and passenger’s satisfaction using quality indicators of bus transport service. By assessing quality attributes, it was found that respondents showed positive attitude toward most of the indicators while least of the indicators revealed negative attitude. Some recommendations have been given below to overcoming the problems that cause the dissatisfaction level. Installations of up to date framework to get the arrangements for economical transport system in future, which is the reason to extend customer satisfaction. Recurrence, punctuality, and travel time are vital factors observed during survey that are responsible for bringing a higher level of satisfaction. Adequate seating capacity should be increased at each bus stop so that passengers can wait for buses patiently and their comfort level can be improved. Availability of seats in a bus is linked with crowd condition when there will no crowd, passengers will get more chances to get a seat. So, the schedule of buses should be designed to accommodate crowding, and everyone should have access to a seat in buses. Ease for elder people should be improvised by making seats reserved for them and allow them to board the bus easily by taking as much time as they want. Lahore BRT corridor needs maintenance as corridor is damaged badly at various points. Buses should be monitored and maintained properly after specific time periods to ensure the quality. For improving service quality, passenger security is very important. To keep customers safe and secure inside buses and at boarding, buses should have good lighting system, security cameras and should keep an eye on the pickpockets and other criminal activities and should also be monitored in cooperation with the police especially at high demand routes and terminals. Quality and management of Metro Buses should be improved by cleaning the environment onboard, running on schedule, providing pleasant environment at stations and maintaining air-conditioning onboard, are prerequisites to obtain passenger satisfaction Social and Environmental impacts of metro bus: Socially, BRT is economical, affordable, time saving as well as health promoting, environment protecting, discipline instilling, a source to create social homogeneity, and community acceptance or satisfaction. It has reduced traffic congestion, air pollution, noise pollution, and road accidents to some extent. According to the survey, respondents wanted that the fares must be less than 20 rupees. About 90% people were very optimistic and hopeful for the BRT with positive opinions. Almost 50% people were agreed with opinion that MBT has reduced the unemployment rate. Most of the people thought BRT has reduced traffic on roads. People used motor bikes within the city but by the advent of BRT most people left their own vehicles and shifted on this service. Some people shifted from conventional buses to BRT because of poor services and inconvenience of old transport system. Poor were not able to afford the high fares of reasonable public transport like Daewoo, meanwhile, rich people did not agree to leave their own vehicles.
MBT has reduced the commuting time and increased the accessibility towards work.
Accessibility to other establishments such as hospitals, schools and colleges also improved
since these are situated along BRT route.
Acknowledgement. Author would like to thank Allah Almighty as well as the concerned
government official of Metro Bus Authority and people for providing necessary information
and guidance while conducting research activities and specially Ma’am Maria(assistant
professor, Department of City and Regional Planning LCWU) who assisted us in the
proofreading of this paper.
Author’s Contribution. I did this work by my own.
Conflict of interest. Authors has no conflict of interest.
Project details. NIL
REFRENCES
1. Abreha, D. A. Analyzing Public Transport Performance using Efficiency Measure
and Spatial Analysis; the case of Addis Ababa, Ethiopia. 2007.
2. Aderamo, A. I. Transport in Nigeria: the Case of Kwara State. African Economic
and Business Review,vol 8 issue 1,pp: 19-40, 2010.
3. Ali, A. N.. An assessment of the quality of intra urban bus services in the city of
enugu, enugu state, Nigeria, Theoretical and Empirical Researches in Urban Management ,
vol 5, issue 6 pp:74-91, 2010
4. Gillani.S.A, Rehman.S, Ahmad.H.H, Rehman.A, Ali.S, Ahmad.A, Junaid.U, and
Ateeq.Z.M Appraisal of Urban Heat Island over Gujranwala and its Environmental Impact
Assessment using Satellite Imagery (1995-2016). International Journal of Innovations in
Science and Technology, Vol 01 Issue 01: pp 1-14, 2019.
5. Hassan.S.S, Mukhtar.M, Haq.U.H, Aamir.A, Rafique.M.H, Kamran.A, Shah.G,
Ali.S and Mahmood.S.A “Additions of Tropospheric Ozone (O3) in Regional Climates (A
case study: Saudi Arabia)”. International Journal of Innovations in Science and Technology,
Vol 01 Issue 01: pp 33-46, 2019.
6. Budiono, O. A. Customer satisfaction in Public bus Transport: A study of travelers
perceptions in Indonesia. 2009
7. Dell'Olio, L., Ibeas, A. and Cecin, P. The Quality of Service desired by Public
Transport Users. Transport Policy, vol 18, issue 1,pp: 217-227, 2011.
8. Hensher, D. A bus bases transit way or light rail. Continuing the saga on choice
versus blind commitment. Road & Transport Research, vol 8, issue 3, pp: 3-30. 1999.
9. Deng, T., and J.D. Nelson. 2012. “The perception of Bus Rapid Transit: A passenger
survey from Beijing Southern Axis Line 1”. Transportation Planning and Technology 35(2):
201-219
10. Hensher, D. Bus Transport: Economics, Policy and Planning, Research in
Transportation Economics. Elsevier, Volume.18, issue 1, pp: 1-507, 2007.
11. Nugroho, S. B., A. Fujiwara, and J. Zhang. (2010). “The influence of BRT on the
ambient PM10 concentration at roadside sites of Trans Jakarta Corridors”. Procedia
Environmental.
12. Juan Carlos Echeverry, Ana María Ibáñez, Andrés Moya, Luis Carlos Hillón,
Mauricio Cárdenas and Andrés Gómez-Lobo Source: Economía , Spring, 2005, Vol. 5, No.
2 (Spring, 2005), pp. 151-196.
13. Gutierrez, L. 2010. “Trans Milenio in the world, in Trans Milenio: 10 years
transforming Bogota”. TRANSMILENIO S.A.
14. HarifahMohd Noor, Na’asahNasrudin, Jurry Foo. Determinants of Customer
Satisfaction of Service Quality: City bus service in Kota Kinabalu, Malaysia, Procedia - Social
and Behavioral Sciences, vol 153, pp:595-605, 2014.
15. JianchengWeng&Xiaojian Di & Chang Wang &Jingjing Wang &Lizeng Mao. "A Bus
Service Evaluation Method from Passenger’s Perspective Based on Satisfaction Surveys: A
Case Study of Beijing, China," Sustainability, MDPI, Open Access Journal, Volume 10, issue
8, pp: 1-3, 2018.
16. KhaledShaaban, Rania F. Khalil. Investigating the Customer Satisfaction of the Bus
Service in Qatar, Procedia - Social and Behavioral Sciences, vol 104, pp: 865-873, 2013.
17. Lindau, L. A., L. A. Senna, O. Strambi, and W. C. Martins. “Alternative fnancing for
Bus Rapid Transit (BRT): the case of Porto Alegre, Brazil”. Research in Transportation
Economics, vol 22, issue 1, pp : 54-60, 2008.
18. Khalid Hassan ·referenced this to Slovin (1960). An Internet search identified
Slovin's first name as Ramus, and several papers referenced Slovin's formula to 'Sevilla et. al.,
1960:182' e.g. Sciences, 2: 914–924.